Stud and Track Steel Drywall Keel Metal Framing Roll Forming Machine Roller stations:12 rowsRoller Material: Cr12‚ Forging‚ lathe finishing‚ quenching‚ Heat treatment HRC58-6Transmission Type: Gear driveSteel structure: Integral plate welding steel structureThickness of StructureRaw material is 25mm, after polishing ,may 23-24mm,Q235Raw material is 30mm, after polishing ,may 28-29mm,Q235Cutting&Hydraulic type servo motor punching and cuttingShaft diameter & material:Shaft diameter: 50mm/Spacer :70mmMaterial:45# steel Machine tool processing heat treatment, then grindingTotal Power:25KW Voltage:380V /3phase/ 50 HZ (or as your requirement)Cutting system:Servo tracking cutting systemLength measurement:Encoder:Omron(international brand)Productivity:45m/minMaterial & Thickness:Material:GI, PPGI;Material Thickness: 0.8mm Uncoiler A .Functional Configuration Put the steel coil on it for feeding raw material B .Technical parameters Loading capacity:3 Ton Coil ID:φ450mm~550mm Coil W idth:200mm Roller A. Material: Cr12 B. Forging, lathe finishing, quenching HRC58-60, polishing C. Roller inner diameter: Φ40mm, outer diameter: minΦ 90mm D. Longer service life Shaft A.Material: high grade 45# steel material B.Forging, lathe finishing, quenching 58-60 degree, polishing C.High precision Main Motor A.Electric Motor:5.5kw,China Brand B.Powerful and running steady, when speed is high, it does not shake. C.Fixed at the bottom of the frame or beside the frame Hydraulic Station A. Oil cylinder and oil pump adopt national standard rod oil cylinder, easy to purchase all over the world. B. The motor is a national standard copper core, universal around the world. C.station power:5.5KW Drive Type: Gear Electric control section A.China Brand control Panel and system to ensure high speed, stability, precision and lifetime. B. Input the length, and pcs, it will control the machine working automatically C.Encoder brand: Omron Low voltage electrical apparatus: Chint Frequency converter: ZONCN System: Light steel keel machine special customization system,single control or two shape running at the same time A.Servo system cutting B.Servo motor: 1.5kw C.Knife material: Cr12, heat treatment HRC 58-60, high wear-resisting knife Front view and top view of CU Channel forming machine :Factory Packing & DeliveryCetificationsFAQ1)Q: Do you have after sales support?A: Yes, we are happy to give advice and we also have skilled technicians available across the world. We need your machines running in order to keep your business running.2) Q: How do your machines compare with other big companies in this market?A: We are up to date with the latest technology and improve our machines accordingly3)Q: How does your factory do regarding quality control? A: Quality is priority. we always attach great importance to quality control from the very beginning to the end of the production. Every product will be fully assembled and carefully tested before it's packed for shipment.4) Q: Do you sell only standard machines?A: No, most of our machines are built according to customers specifications, using top brand name components5) Q: Can you make the machine according to my design or proto type? A: Yes. We have an experienced team for working out the most suitable design and production plan for the machine that you are going to book with us 6)Q: How can we be assured that you will deliver us quality machine with spare parts? A:1. Customers to send the technical people to our factory for checking the quality.2.We can send the technicians to the buyer`s factory for the installation of the machine. 3.Good aftersales-service, its free of charge during the warranty period.7)Q:What can you do if the machine broken?A:Our machine's warranty period is 12months,if the broken parts can't repair,we can send the new parts replace the broken parts freel, but you need pay the express cost yourself. if after warranty period, we can look at negotiation to solve the problems, and we supply the technical support for the whole life of the equipment. 8:How to play order?Inquiry---confirm the profile drawings and price----confirm the PI---arrange the deposit ---then OK9:How to visit our company?Fly to Tianjin airport, we will pick up you at the airpport. /* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1
Related products about Stud and Track Steel Drywall Keel Metal Framing Roll Forming Machine
-
Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
-
Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
-
Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
-
Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
-
G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
-
New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
-
China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
-
Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup