Range of applicationThe mucking loader is mainly used in coal mines, metal mines, hydropower tunnels and other underground projects. The company has developed different kinds of loaders many times and Updated them to adapt to different working conditions including section from2.0 X 2.0 m to 9 X 9 m (Height X Width), slope within 33 degrees. Main characteristics1. The mucking loader adopts Electrohydraulic control system with reduced-voltage startSuitable for long tunnel projects. 2. Main movements controlled by pilot valves, Easily operated and stable. 3. 30% of the configurations are imported. Oil will be Multistep filtered. With air cooling radiator. 4. Load rocks completely without labor work. 5. Convey rocks with chain -scraper, stable and high efficiency. 6. Semi-enclosed assembling, easy to maintain. Main Overall DimensionLWL-180/79LCrawler contacting ground length2159 mmCrawler inner width1130 mm (variable)Crawler plate width450/550 mmGround clearance395 mm (variable)Conveyor inner width780 mmDimensions during transportLength9400 mmWidth2100 mmHeight2390 mmDimensions during operatingLength11500 mmWidth2100 mmHeight2514 mm Working Range ItemLWL-180/79LADigging width7030 mmBDigging distance(from dozer blade)3260 mmCDigging height4635 mmDDigging depth below ground level990 mmEDumping height2000 mm (variable)FMinimum dumping height1680 mm (variable)GDumping distance2680 mm (variable)HMax. boom angle±55° Adaptive tunnel dimension(Width × Height)≥3.8×3.8 m Functional Parameters LWL-180/79LLoading ability180 m3/hGeneral power79 kwWeight19200 kgTraveling speed0.6±5% m/sScraper chainDouble chains double motors/Single chain double motorsAdaptive tunnel slope≤15°Minimum turning radius≥8mGround pressure≤0.1 MpaSteeringHydraulicSpeed of scraper chain44m/minVolume of hydraulic tank400LMaximum working pressure28 MpaHydraulic pumpPlunger pump×2 + gear pump×2walking hydraulic motorRadial plunger motor×2Conveyor hydraulic motorRadial plunger motor×2Company ProfileShipmentOur CustomerExhibitionFAQ1. Will necessary spare parts be offered in time? Normally we suggest customers to buy spare parts for at least 2 years of operation once they buy a new equipment. We will also deliver enough spare parts to our distributor in some countries. 2. How to solve the unusual faults during operation? SITON will give prompt reply on how to repair the equipments within 24 hours once we receive the fault report. We can also send engineers to the site if necessary. 3. Does SITON offer training for operating and maintenance? Customers can send their engineers to SITON for one week training and necessary accommodation will be offered free of charge. We will send engineers to the site for technical support if customers requires. /* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1
Related products about Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders
-
Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
-
Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
-
Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
-
Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
-
G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
-
New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
-
China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
-
Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup