The capacitors are designed for power factor correction and harmonics filtration at medium voltage. They are all-film dielectric - polypropylene foil impregnated with an environmentally friendly, non-toxic biodegradable insulating oil. There is the aluminium foil as the electrodes. This construction assures minimal looses of the capacitors. Three-phase units are in star - Y connection, single-phase units are in I connection. The capacitors have internal discharge resistors. Company Profile Founded in 2002, Sanhe Power Tech is a national high-tech enterprise that specializes in power quality products, R&D of technology and solutions, production,service etc. It becomes industry-leading company. The company has got multiple technologies including. 28 invention patents, 24 software copyrights, 22 national standards and 15 industry standards drafting. Sanhe Power Tech is a member of international committees such as the International Electrotechnical Commission (IEC) the Institute of Electrical and Electronics Engineers (IEEE) etc. The software development system has passed the CMMI evaluation of the American SEI. There are three main business covering: A full range of power quality testing and governance products and complete solutions. Distributed new energy system products and advanced solutions. Primary and secondary engineering based on "dual carbon" and energy management with standardized and professional engineering services. Our AdvantagesSimulation of GRID Reactive Load FlowAnalysis of L-C Circuit Amplitude-frequency CharacteristicIntegration & Relay Coordination ReactionCharacteristic Curve of Permanent Magnet BreakerSampling & Filtering of Electronic CircuitIGBT Driving & ProtectionPWM TechnologyTechnology about Semiconductor Forced CommutationThermal Simulation & Heat Exchange DesignFeed-forward Second-order Complex Vector Algorithm3D & Data SimulationInstrumented IOT CommunicationVP Scheduling & DispatcherDigital Twins of Micro-Grid & Islanding-Grid FAQWhat kind of payment terms can we accept?Payment in advance,Installment payments,Letter of credit(L/C). What is the lead time of products?According to different products, the lead time is different.For standard products like APF,SVG, the lead time is one week.For customized capacitor bank etc, the lead time is 25 to 45 days. How to find the product model if you are some demand?If you need our technical guide,please advise your problem details as much as you can,we can give more reasonable solution.You may provide following drawings or reportSingle line drawingPanel primary scheme drawingPower quality test report(mainly about harmonics) How to find the product model if you have details electrical drawings?Please advise Load name plate, load working condition, existing power factor, target power factor, harmonic times etc Or Rated voltage,compensation capacity, harmonic times(reactor detuning factor), other components etc. How to find the product model if you can not provide enough information?We can supply your products according to your technical requirement.We can go to your project site and give a professional test report after test. Why do we choose Sanhe power quality solution?Sanhe has specialized in over 20 years experience in power quality products and solution. We have met most of power quality problems and gave the solutions.What kind of technical service does Sanhe provide?• Project-site power quality test ( or test report from customer)• Improvement solution and budget• Product solution and price• Products supply• Product commissioningWhat kinds of standards does Sanhe product conform to?Except China standards, Sanhe products also conform to IEC standards includingIEC61921 :2003 IEC61000-4-5:2005IEC60529:2001 IEC60931-1: 1996IEC60439-1 :2005 IEC60664-1 2007IEC60831-1: 1996 IEC61000-4-3/2/4/5/18 IEC61000-2-4IEC60255 IEC62208 2011…IEC255-22-1What is the compensation effect after using Sanhe products?• Harmonic filtering meets standard• Power factor is over 0.95,electrical bill saving,low reactive power penalty killing• Reducing the loss of transformer and lineimprove the distribution ability,prolong the lifespan of electrical equipmentHow long is the product guarantee time?Usually,the guarantee time is one year. However,we can accept over 5 years too. Please contact our sales to get details information.How to become the distributor or agent of Sanhe brand products?Sanhe is looking for overseas distributor and agent. If you are interested in it, please feel free to contact us. /* January 22, 2024 19:08:37 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1
Related products about Single Phase Medium Voltage Capacitor
-
Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
-
Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
-
Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
-
Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
-
G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
-
New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
-
China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
-
Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup