Product DescriptionProduct NameIFAN OEM Water Supply Plastic PVC Pipe Cream ASTM 2846 CPVC PipeColorWhite Or Customized Welcome Size(mm)1/2"-2''StandardASTMPackageIFAN PackageConnectionCPVC GlueOEM&ODMSupportSampleFree SampleCompany ProfileCertificationsWhy Choose UsPackaging & ShippingFAQ1.Q: Are you a manufacture or trading company? A: Yes. we're professional manufacture in China,and have been in this field for more than 30 years. 2.Q: lt is possible to get samples from your factory? A: Yes. free samples will be sent if needed, but thefreight can be negotiated or chargeable, it will berefunded after confirmation of the order.3. Q:What is CPVC pipe? A:CPVC pipe is a type of plastic pipe used to transport high temperature fluids. Its full name is Chlorinated polyvinyl chloride pipe (Chlorinated polyvinyl chloride pipe), also known as dichloride pipe.4. Q: What are the advantages of CPVC pipe? A: High temperature stability, corrosion resistance, high strength, energy saving and consumption reduction, safety and sanitation.5. Q: How are CPVC pipes connected? A: 1. Preparation: Before connecting, you need to prepare the required materials and tools, including CPVC pipes, joints (elbows, tees, straight-throughs, etc.), pipe cutters, heat guns, CPVC welding materials, etc. 2. Cutting: Use a pipe cutter to cut the CPVC pipe to the required length. Pay attention to ensure that the end surface of the pipe is smooth and flat without burrs and cracks. 3. Cleaning: Clean the end faces of pipes and joints with detergent to ensure that the joints are clean and dust-free, so as not to affect the quality of the connection. 4. Splicing: Insert the CPVC pipes and joints into the heat gun and heat them separately until their temperature reaches 260°C~290°C, then splice them together and keep the connection until the cooling is complete. 5. Fixing: After the connection is completed, use the pipe clamp to fix the connection part in order to ensure the quality of the connection and avoid loosening or slipping. 6. Inspection: After the connection is completed, it is necessary to inspect to see if there is any water leakage or leakage, and repair it immediately if there is a problem./* January 22, 2024 19:08:37 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1
Related products about Ifan OEM Water Supply Plastic PVC Pipe Cream ASTM 2846 CPVC Pipe
-
Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
-
Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
-
Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
-
Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
-
G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
-
New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
-
China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
-
Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup